Haslet, Texas · Pool & outdoor kitchen renovation
Haslet Pool & Outdoor Kitchen Renovation
H30 completed a major pool and outdoor kitchen renovation in Haslet in five weeks. The work brought together Classic Light travertine finishes, a tiered cascading spillway, updated wall and waterline tile, a spray-textured deck overlay and kitchen alterations for updated appliances.

- Project scope
- Major renovation
- Stone finishes
- Classic Light travertine
- Deck finish
- Spray-textured overlay
- Construction time
- Five weeks
The renovation
An updated look for an existing backyard.
This Haslet project was a major renovation of an existing pool and outdoor kitchen. H30’s work addressed aging decorative features, faulty waterfall units, the surrounding finishes and the kitchen’s appliance openings.
The scope combined visible changes around the pool with smaller repairs involving its lights and valves. Classic Light travertine finishes, updated tile and a deck overlay form part of the completed renovation.
Walls and water features
Boulder features replaced with a modern wall.
Aging boulder features and columns were jackhammered out and replaced with a modern vertical wall. Updated square and waterline tile completed the changes around the water.
The finished design includes a tiered cascading spillway. Faulty LED sheer-descent waterfall units were also removed, with water-only replacement units installed and their plumbing updated.
Stone and deck finishes
Travertine details and a textured deck.
Classic Light travertine finishes were included in the renovation. Around the pool, the deck received a spray-textured overlay, providing a separate finish from the project’s travertine details.
Together with the updated tile and vertical wall, these changes shape the appearance of the completed pool area. The photographs show the deck, pool and raised spa after the work was finished.
The outdoor kitchen
Making room for updated appliances.
The existing outdoor kitchen was renovated alongside the pool. Its openings were enlarged to accommodate updated appliances, adapting the kitchen’s built-in layout to the equipment used in the finished space.
The kitchen photograph shows the completed cooking and counter area. This part of the work extends the renovation beyond the water and deck to another part of the backyard.
Repairs and construction time
Five weeks for this renovation.
Minor equipment repairs involving pool lights and valves were included in the project, alongside the wall, waterfall, finish and kitchen work.
Construction took five weeks. That duration describes this Haslet project; the scope and condition of another existing pool or outdoor kitchen may require a different schedule.
The finished renovation
A closer look at the completed work.
Explore three photographs of the finished pool area and outdoor kitchen. Select a photo to open the full-window gallery.

The renovated pool and water-feature wall
Curved swimming pool in Haslet with a light-colored vertical water-feature wall, tiered spillway, coping and textured surrounding deck.

A refreshed deck around the pool
Wide textured deck surrounding a curved pool, with the rebuilt water-feature wall beyond and a covered outdoor kitchen beside the home.

Spa, deck and outdoor kitchen
Raised curved spa with light coping and a stone-faced exterior beside the textured pool deck, with an outdoor kitchen under the patio roof.
The completed project
A refreshed pool area and outdoor kitchen.
The completed renovation combines the updated wall, tile, water features, stone finishes and deck overlay with a kitchen adapted for updated appliances. Three photographs document the finished Haslet backyard.
Project details
A few questions about this renovation.
What did this Haslet renovation include?
The work included travertine finishes, a deck overlay, a modern vertical wall and updated tile, water-feature changes, outdoor kitchen alterations and minor pool-light and valve repairs.
What finish was used on the pool deck?
The deck received a spray-textured overlay. Classic Light travertine finishes were also included elsewhere in the renovation.
How was the outdoor kitchen updated?
The existing kitchen was renovated and its openings enlarged to accommodate updated appliances.
How long did the project take?
Construction took five weeks for this Haslet renovation. That is this project’s duration, rather than a fixed schedule for every H30 renovation.